Zerodec

From Conception To Reality
Gillespie

Zerodec: Engineered Internal Cladding

Zerodec is an engineered off-site fabricated material capable of physically reproducing the most complex 3D shapes to enhance modern interiors buildings and public spaces.

Zerodec Advantages

Zerodec Features
A superior quality finish to almost all comparable solutions
Independently Fire Testified, Certified to BS476
Fully tested to meet regulatory requirements, reducing long term project risks
Off-site Design led engineered manufactured solution
Project Benefits
Variable costs more controllable, reduced commercial risk to budget
On site periods reduced, installation times significantly shortened
Construction programmes may be readily improved
Potential insurance, and further remedial and testing costs reduced
Less risk with fewer site operatives required
Reduced need for programme extensions
More durable through building life-cycle
Reduced potential on-site damage, and post-installation remedial works
Lower maintenance costs
Greater certainty of on-time payment

Product Applications

The primary benefit of Zerodec GRG is the opportunity to provide the designer with a solution to create almost any shape to suit their design intent, and to include 3D complex cladding on any project.

In addition Zerodec can be categorized or standardized by application, and the inherent advantages of using Zerodec can be found in the following applications:

  • Seamless 3d Ceilings or Walls
  • Bulkheads
  • Light Wells
  • Column Cladding, Curved or Rectangular, and accessible
  • Recessed Light Units
  • Light Troughs
  • Perimeter Blind Boxes
  • Access Panels
  • Monolithic Acoustic Substrate
Warringtonfire certificate
Approved contruction line accredited
warringtonfire certificate blue

Mailing List

I would like to receive updates from Gillespie.
I understand I can unsubscribe at any time.

Address

Abbey House,
282 Farnborough Road,
Farnborough
GU14 7NA

Company

Gillespie management, sales, design office and accounts based in Farnborough, UK. Our factories have a permanent staff of 40+, and additional staff are added for larger projects, should we need to supplement to meet programme requirements.

Scroll to Top