Project: 22 Bishopsgate EC2N
Architect: PLP Architecture
Main Contractor: Multiplex
Installer: Errigal Contracts Ltd
Zerodec GRG solutions installed to lobby areas including columns, escalator and light troughs. Zerodec ceiling perimeter bulkheads to 56 upper floor levels. As an alternative to the plasterboard the dry lining contractor introduced Zerodec GRG to the bulkheads. This change clawed back 100 days of programme time, saving on metal framing, giving crisper cleaner lines, with significantly lower labour levels. Quality of finish under critical light was also particularly important, and further risks to the programme were eliminated by the use of Zerodec, as it vastly reduces the risk of defects.